Engineered Solutions

Case Studies

Case studies highlighting Saltire’s impactful water and pipeline projects across Australia, showcasing solutions that prioritise quality, safety, and efficiency across diverse infrastructure challenges.

Map Filter
Search

Category

Category
  • Community Engagement
  • Technology
  • Water Mains
  • Construction
  • Construction - Remote Area
  • Dilapidation Inspections
  • Emergency Water Mains Leak
  • Reactive and Emergency Services
  • Design Assessment
  • Design Assessment & Construction
  • Traffic Management

Technologies

Technologies
  • Hot Tapping
  • Live Pipeline Inspection
  • Horizontal Directional Drilling (HDD)
  • Hydro-Pressure Testing
  • Flow Stopping
  • Pipeline By-Pass
  • S-Gate Valves
  • Dewatering
Smiling diverse business team posing for a professional company photo.

Bell St Bridge Internal Pipeline Condition Assessment

water_pipeline_contractor_award_winner

Caves Road DN560 Water Main Upgrade, Busselton WA

saltirecase_03_a-1024x768-landscape-05ca249f3df0d4d0b9097d013772ece0-

Duncraig Sewer Pressure Main Extension

Sunny beach with gentle waves and golden sand

Firewater Line Asset Condition Assessment

Hot tapping and live CCTV pipe inspection in Halls Head project site

Halls Head Hot-tapping and CCTV Live Inspection

Workers installing a new sewer pressure main along Hyland Street.

Hyland Street Sewer Pressure Main Installation

Drone inspecting infrastructure assets for condition monitoring.

Live Asset Condition Assessment – Kangaroo Ground, Victoria

Metronet Armadale Line rail upgrade construction project in Perth, Western Australia

Metronet – Armadale Line Upgrade & Water Service Relocation

Smiling friends enjoying a sunny outdoor day together

Non-Disruptive Pipeline Mapping in Byford

Workers replacing regional community water mains system infrastructure

Regional Communities Water Mains Replacements

Regional water distribution infrastructure and pipe network development project

Regional Water Reticulation Replacement Program

Albany Highway

Reticulated Water Main on Albany Highway

2026CASE_01_A-1-768x576

Solving a Major Leak in Three Springs

Pipeline construction site with saltire structure
Proven Under Pressure

Our Capabilities

At Saltire, we pride ourselves on delivering intelligent, tailored solutions for water infrastructure. Our expertise spans from major project consultancy in civil construction to rapid emergency repair works, ensuring reliable and efficient water networks at every scale.

Key Advantages

Eliminate Shutdowns & Outages

Ensuring the continued operation and supply of water to stakeholders.

Reduce Construction Footprint

Reduce excavation work and traffic management with location-specific isolation solutions.

Safer Equipment

Safe, modern and efficient equipment engineered to comply with international and Australian standards.

Reduce Environmental Impact

Eliminate loss of treated water on the network by redirecting supply during maintenance work.

Save Money

Save an average of 40% of installation and repair work by eliminating 100% of the costs related to system shutdown.

Service

Saltire provide reliable and emergency services you can count on and customised for your needs.

Our clients rely on us to innovate, deliver and excel.

Our team possesses a strong understanding of client requirements and we focus on building long term professional relationships and exceeding expectations within safety, quality, and environment. Being a Western Australian owned and operated company, Saltire supports local communities by prioritising partnerships with WA suppliers and Contractors.

ISO certification and standards associations logo