Hyland Street Sewer Pressure Main Installation

Project Overview

Installation of approximately 700m of DN450 sewer pressure main as part of the Hyland Street SPM upgrade. Installation was via a combination of Horizontal Directional Drilling (HDD) and open excavation up to depths of 5m.

Client:Water Corporation
Scope:DN450 Sewer Pressure Main Construction
Value:$2.4M
Workers installing a new sewer pressure main along Hyland Street.

Key Elements

 

  • Deep excavation and shoring installation
  • Dewatering and water management
  • HDD drilling
  • Mechanical installation (valves, puddle flange, stub flanges etc.)
  • Pressure testing and construction verification
  • MSCL welding works
  • DN450 PE – welding
  • Service locating including dry-vac work to investigate existing sewer system network
  • Planning and coordinating sewer pressure main shut-down and link-in with Operations Services including waste tankering/disposal
  • Grout filling of redundant mains
  • Traffic Management Planning and implementation
  • Road Pavement reinstatement
  • Community Engagement and dilapidation inspections

The Saltire Advantage

Eliminate Shutdowns & Outages

Ensuring the continued operation and supply of water to stakeholders.

Reduce Construction Footprint

Reduce excavation work and traffic management with location-specific isolation solutions.

Safer Equipment

Safe, modern and efficient equipment engineered to comply with international and Australian standards.

Reduce Environmental Impact

Eliminate loss of treated water on the network by redirecting supply during maintenance work.

Save Money

Save an average of 40% of installation and repair work by eliminating 100% of the costs related to system shutdown.

Service

Saltire provides reliable and emergency services you can count on and customised for your needs.

Innovate

Our dedicated focus on the water services sector means we have our finger on the pulse in the latest technologies and industry developments. We think outside the box to develop the best solution for each product.

Deliver

Our commitment to safety and professionalism means our focus is on projects being delivered on time, within budget, and to the highest standards of safety, quality, and environmental management.

Excel

Our mission is to exceed client expectations in terms of safety, presentation, engagement, and delivery. Our performance is monitored through both formal and informal feedback as part of our continuous improvement initiatives.

Proven Under Pressure

Our Capabilities

At Saltire, we pride ourselves on delivering intelligent, tailored solutions for water infrastructure. Our expertise spans from major project consultancy in civil construction to rapid emergency repair works, ensuring reliable and efficient water networks at every scale.

Unique Solutions

Industry Leading Technology

We harness a unique mix of technologies and solutions to ensure your system continuity during repairs. This includes hot tapping, flow stopping and s-gate valves.

Our clients rely on us to innovate, deliver and excel.

Our team possesses a strong understanding of client requirements and we focus on building long term professional relationships and exceeding expectations within safety, quality, and environment. Being a Western Australian owned and operated company, Saltire supports local communities by prioritising partnerships with WA suppliers and Contractors.

Modern flat web and app interface icons set