Solving a Major Leak in Three Springs

Project Overview

In June and July of 2022, a major leak was discovered in the main pipeline that was the single feed to the town of Morawa and surrounds. The leak posed a significant threat to the town’s water supply and needed to be fixed immediately.

The high-pressure main and the responsibility of dealing with a single feed to a farm community and township presented significant challenges for Saltire. The company had to quickly mobilize pipe, materials, and personnel to the remote site, which was located approximately 500km from their base in Perth Canning area. The job had to be completed during Covid restrictions, adding to the challenge.

Client:Water Corporation
Scope:Emergency Water Main Isolation & Repair
Value:$400k
2026CASE_01_A-1-768x576

Key Elements

Saltire’s crew were mobilised to the farm town to solve the leak. The company utilised 3 in-house technologies to replace the existing main, while continuing to supply water to the town of Three Springs. Firstly, two S-Gate valves were installed on the outer limits of the proposed pipe replacement. Second, hot tapping was performed on each side of the main, to facilitate a by-pass main set-up and third a DN 110 PE by-pass was connected using Hawle System 2000 mechanical couplings. Once the by-pass was in place, the S-Gate valves were used to shut down the leaking section of the pipeline, and the road was cut, the old pipeline was dug up and removed. The new pipeline was then placed and welded, and after treating the pipe with chlorine and testing the pressure, the new section was connected to the main and the by-pass was removed. Finally, the road and side road was reinstated.

Saltire’s quick and efficient solution to the major leak in Three Springs demonstrates the company’s expertise and ability to handle challenging and time-sensitive projects. The use of a combination of technologies provides a unique offering within W.A. for this type of urgent repair works.

Significant Achievements and Benefits

Despite the challenges, Saltire delivered all aspects of the project, including hot tapping, S-Gate valve installation, pipeline construction, commissioning, and road reinstatement. The company mobilised to the site to undertake the emergency repair work in just three days after the client’s approval and completed the job in approximately two weeks. The successful completion of the project ensured that the towns of Morawa, Koolanooka and multiple farms had a reliable water supply without disruption during the urgent repair works. The client for the works has commended Saltire for the ability to perform the task to completion at the highest quality in such a short timeframe.

The Saltire Advantage

Eliminate Shutdowns & Outages

Ensuring the continued operation and supply of water to stakeholders.

Reduce Construction Footprint

Reduce excavation work and traffic management with location-specific isolation solutions.

Safer Equipment

Safe, modern and efficient equipment engineered to comply with international and Australian standards.

Reduce Environmental Impact

Eliminate loss of treated water on the network by redirecting supply during maintenance work.

Save Money

Save an average of 40% of installation and repair work by eliminating 100% of the costs related to system shutdown.

Service

Saltire provides reliable and emergency services you can count on and customised for your needs.

Innovate

Our dedicated focus on the water services sector means we have our finger on the pulse in the latest technologies and industry developments. We think outside the box to develop the best solution for each product.

Deliver

Our commitment to safety and professionalism means our focus is on projects being delivered on time, within budget, and to the highest standards of safety, quality, and environmental management.

Excel

Our mission is to exceed client expectations in terms of safety, presentation, engagement, and delivery. Our performance is monitored through both formal and informal feedback as part of our continuous improvement initiatives.

Proven Under Pressure

Our Capabilities

At Saltire, we pride ourselves on delivering intelligent, tailored solutions for water infrastructure. Our expertise spans from major project consultancy in civil construction to rapid emergency repair works, ensuring reliable and efficient water networks at every scale.

Unique Solutions

Industry Leading Technology

We harness a unique mix of technologies and solutions to ensure your system continuity during repairs. This includes hot tapping, flow stopping and s-gate valves.

Our clients rely on us to innovate, deliver and excel.

Our team possesses a strong understanding of client requirements and we focus on building long term professional relationships and exceeding expectations within safety, quality, and environment. Being a Western Australian owned and operated company, Saltire supports local communities by prioritising partnerships with WA suppliers and Contractors.

Modern flat web and app interface icons set